Sammi
quick blind valves have the successful combination of two
essential
criteriazero leakage to the downstream and safe and easy blinding
with untrained person.
And
our products are manufactured under the strict quality control system.
Absolute
shut off
In the closed status, any liquid or gas cannot leak to the downstream
Quick change
Heavy pipe line can be blinded safely within 30 sec. ~ 2 min.
Only one operator
Untrained one person can operate with ease and safe upto 24"
pipe line.
Non line spread
The operating principal of Sammi Line Blinds eliminate the need
to spread pipe, valve or flange.
Cost saving
Not only saving man-hours, but increasing the production time
No tools
Turns hand wheel, then swing or sliding the blind plate without
tools and cranes.
Safety working
Blinding with the Sammi is not labor intensive and no more jeopardizes
safety with few people around the pipe work
Simple structure
Simple and solid structure needs minimal maintenance only for
sealing gasket replacement.